Steam production unit SCU

Equipment delivery set
  • Steam boiler PAR-0,5-0,07
  • Diesel burner
  • Make-up tank for 3 cubic meters. (up to 6 hours of uninterrupted operation)
  • Fuel tank capacity of 290 liters
  • Fire suppression system
  • Security system
  • Gasoline generator
  • Metal container
Production time
  • 30 business days
Guarantee
  • Warranty period - 12 months

Description

The steam production unit UPP-0,5 W is a device that produces steam by heating during the combustion of diesel fuel, which is used in the production of concrete in winter at concrete plants and BSU. This installation works in automatic mode and does not require the constant presence of personnel. The automatic control system controls the water level in the boiler, the pressure.

The main function of the installation is to warm up inert materials in the flow bins and preheat the water to the required temperature for subsequent supply to the BSU concrete mixer.

In addition, the installation can perform many additional tasks on construction sites and construction materials industries. These are heating of the finished concrete mixture, steaming of reinforced concrete products in steaming chambers, removal of snow and ice when pouring concrete, heating of various machines and mechanisms, thawing of drainage and sewer systems, thawing of soil, as well as autonomous heating of utility rooms.

The design of the installation is a container-type block module, inside which technological equipment is installed: a steam boiler with a burner, as well as a power shield and an automated control system.

The modular design makes it easy to transport to almost any hard-to-reach place. It is not required to erect foundations and capital structures, as well as to carry out any design and installation work.

With the help of a pipeline, the equipment is connected to the BSU steam pipeline system.

Advantages and advantages of the Block-modular steam installation UPP-0,5W:

  • The use of conventional diesel fuel (diesel fuel);
  • Low working pressure — 0.07 MPa;
  • The steam boiler is not subject to the “Rules for the device and safety of operation of pressure vessels (see paragraph 1.1.3 of the “Rules …”), which makes them NOT CONTROLLED BY ROSTECHNADZOR;
  • High efficiency – 90-92%;
  • Getting steam 15-20 minutes after switching on;
  • Transport dimensions and weight of the equipment;
  • Easy operation and maintenance;
  • No need for installation and commissioning due to the modular design of the equipment;
  • Environmental friendliness and minimum noise level during operation;
  • Lower price compared to imported analogues.
  • Technical Specifications
  • Cost
  • Video review
Name of the installation UPP-0,15 UPP-0.3 UPP-0.5 UPP-0.7 UPP-1,0 UPP-1,6 UPP-2.0 UPP-2,5
Recommended steam boiler STEAM-0.15 STEAM-0.3 STEAM-0.5 STEAM-0.7 STEAM-1.0 PAR-1,6 STEAM-2.0 STEAM-2,5
Steam capacity, kg of steam/hour 150 300 500 700 1000 1600 2000 2500
Maximum working steam pressure, MPa 1,6
Fuel tank capacity, l (optional, by request) 150 150 300 300 500 500 1000 1000
Climatic version UHL1
Heating time to operating pressure at maximum steam capacity, min 20

Dimensions:

Length, mm

Width, mm

Height, mm

4800

2400

2700

5200

2400

2700

5200

2400

2700

6200

2400

2700

6200

2400

2700

7000

2900

3000

7300

2900

3000

7300

2900

3000

Weight, kg (without boiler) 2300 2500 2500 3100 3100 3300 3500 3500
Option Cost, rub
Container block with door, window, heater and electrics For STEAM boilers-0.5 For STEAM boilers-1.0 For STEAM boilers-1,6 For steam boilers-2,0/2,5
921 720 1 083 720 1 402 332 1 448 400
Steam boiler According to the price list
Diesel burner On request
Boiler installation 114 000
Installation of diesel fuel capacity (290 liters) 75 000
Installing the generator 42 000
Installation of a water tank (3 cubic meters) On request
Ventilation 38 400
Fire alarm system 174 000